etap cable derating error message Big Stone Gap Virginia

Address 2104 Exeter Road, Appalachia, VA 24216
Phone (276) 395-4765
Website Link
Hours

etap cable derating error message Big Stone Gap, Virginia

The system returned: (22) Invalid argument The remote host or network may be down. Solutions Smart Grid - Distribution Management System Network Topology Builder & Processor State & Load Estimation Advanced Alarm Processing Distribution Network Applications Geographic Information System Switching Sequence Management Interchange Scheduling Demand IEEE GlobalSpec does not verify or warrant the accuracy or completeness of any information on this site and, to the extent permitted by law, IEEE GlobalSpec shall not be liable for Free Download Online Videos Downloader From Any Site there.

Slideshare uses cookies to improve functionality and performance, and to provide you with relevant advertising. The network size is less of an issue these days unless you have 10000+ busbars. Typically these have been developed over the past 20 to 30 years so are fairly well refined. All rights reserved.

Steve slees Posts: 91 Joined: 08/10/05 HV software packages Posted by slees on Jun 12, 2007 5:02 pm Thanks Steve, we are looking for a package that could be used by For example we have IPSA+, PSSe and PSLF. PSSe for example does 60000+, IPSA+ does 4000, ERACS does up to 1500 and ETAP does 10000+. Rusdy Hartungi Jonathan Hill Posts: 244 Joined: 09/09/02 HV software packages Posted by Jonathan Hill on Aug 30, 2007 7:27 pm Others include: SINCAL from Siemens DigSILENT Google for links.

What's New? The Institution of Engineering and Technology is registered as a Charity in England & Wales (no 211014) and Scotland (no SC038698) Online Community Software by Small World Labs minitowerscm.cf Home Cable I'm in the design consultancy section - the software isnt an industry standard as such however a demo version can be downloaded for viewing of loadflow calculations. With Span.

Try here:NFPA 70: National Electrical Code® __________________ Luck comes and goes. Master can be a very important tool when using jointly shared poles.Download Patch: After you download Span. When a material is not given in IEC Table, a conservative value of 6.0 is used for IEC cable derating. They will send you a proposal.

ETAP is dedicated to providing our customers with superior product experience. It is supposed to be placed with a spacing of 190mm in flat configuaration between conductors or in triplex form (we are not considering this triplex form here). I must say you are only one here who have understood the problem and given a close solution. There may also be problems when GE tries to buy a copy of PSSe from Siemens!

Master makes it easy to conduct a design "checkup" before actual installation begins to determine how strand size, cable bundle size, span length, and the amount of sag will affect the ETAP 14 Available Now! The information contained on this site is by users for users and is provided for information purposes only and does not constitute advice. Your cache administrator is webmaster.

Slideshare uses cookies to improve functionality and performance, and to provide you with relevant advertising. IPSA+ is used by quite a few of the UK distribution network operators. Reply Techart Power-User Join Date: Apr 2006 Location: Ogden, Utah Posts: 164 Good Answers: 5 #7 Re: Ampacity of Buried Cable 06/11/2013 9:56 PM Don't know if this will help, but Posts: 24862 Good Answers: 645 #4 Re: Ampacity of buried cable. 06/11/2013 12:20 PM Yep.

Power System Automation Software, Hardware ETAP Automation offers sales and support of ETAP® products. Home | XML Sitemap | Local ETAP Offices | Terms of Use | Privacy Policy © Operation Technology, Inc. Common error- Bus voltage is not normal, however i have used the same parameters in another software and that seemed fine. The calculation is based on the IEC 60287 standard or the NEC accepted Neher-McGrath approach, which employs a thermal circuit model to represent heat flow situations.

Since all the conductors in a cable branch are assumed to equally share the load current, in the case where these conductors are not located in the same conduit/location, they may Table 310.15(B)(16) Allowable Ampacities of Insulated Conductors Rated Up to and Including 2000 Volts, 60°C Through 90°C (140°F Through 194°F), Not More Than Three Current-Carrying Conductors in Raceway, Cable, or Earth Copy to Clipboard Users who posted comments: 7anoter4 (3); Anonymous Poster (1); IQ (2); jack of all trades (1); lyn (2); marahman2 (1); PWSlack (1); Techart (1); Tornado (1) Previous in See our User Agreement and Privacy Policy.

If for any of the cables the Fixed Current option from the Loading page of the Cable Editor is checked then Uniform Temperature calculations cannot be conducted. If you had maintained the spacing, I am sure the factor is 0.9. The system returned: (22) Invalid argument The remote host or network may be down. Install Echo Eyelet there.

Cable ampacity and sizing are included in the ETAP Electrical Power Systems Software Base Package. Recommended Competitive Strategy Fundamentals Sales Skills Fundamentals Entrepreneurship Fundamentals Current carrying capacity of cables Renkalec Training Centre Analyses and monitoring of 132 k v grid using etap software ARSLAN SAJJAD Acrobat Click here to find an office near you. I definitely do not need more than 1000 buses.

There are many "Gurus" here who have a tendency to jump to all sorts of questions and try to answer those. The network size is less of an issue these days unless you have 10000+ busbars. Sales Request Quote Engineering Analysis Software Power Management Software Maintenance Contract GSA Schedule License Options Single Site Corporate License Configuration Stand Alone Concurrent User Network LAN Concurrent User Network Regional WAN ETAP's modular structure allows you to purchase only the modules you need.